Fill placed beside a sloping cut
A level house pad on a slope is often half cut into natural ground and half built up with imported or pushed fill.
The two halves can settle and move differently, which strains a slab that spans both.
We sample on both sides of the platform, run field density tests on the fill where needed and report the class so the footing design allows for the change in ground.